Roofing in Frostburg

Prime Roofing & Exteriors

EXPERIENCE AND QUALITY OF THE INSTALLER

ROOFING

The preparation of the roof deck and type of shingle being installed are both very important factors in determining the best fastening method for each roofing job. However, the quality of the roof system depends on the workmanship of the contractor more than the method of installation. Blame should be placed on the inexperience or carelessness of the installer when roof systems fail prematurely or shingles blow off. The outcome usually isn’t positive when a poor contractor is involved. Angie’s list and the BBB are good places to verify a contractor’s experience and reputation.

A good contractor will know which system will yield the best results. Prime Roofing and Exteriors practices both hand nailing and uses pneumatic nail guns. A nail gun is used by our installers approximately 85% of the time while hand nailing occurs at our company around 15% of the time.

  • Type of Roof Sheathing
  • Type of Shingles
  • Experience and Quality of the Installer

Prescriptively requires that drip edge be installed at the eaves and gables of all new shingle roofs. A reroof of an existing dwelling is treated as a new roof installation and must comply.

If your roofing is buckled, there are missing shingles, it’s leaking, or there are shingle pieces or granules coming out of your downspouts — you need to have your roof inspected for a replacement. Roofing shingles of “a few years back” don’t often last as long as the warranty.

Yes, we specialize in roof repairs. Most roofing contractors don’t want to do repairs. We often repair roofs for entire neighborhoods because people are pleased with our work and our prices are very reasonable.

Depending on the severity of the weather event that just caused your roof leak, we can usually get by and have a look within a day or two.

Most normal roofs can be replaced in one (1) day. We design the size of our experienced, certified crews to install your roof quickly, so that the job doesn’t linger. Unlike others, we can design the schedule around weather events better, and don’t interrupt your normal day-to-day routine as much.

From the signing of the roof proposal and the picking of roof shingles and color, we can usually start your roof withing two (2) weeks, weather permitting.

No, in fact roofing is a noisy operation and many of our customers elect to be away from home. It doesn’t matter to us; feel free to do what you wish. I will, of course, be taking before, during, and after roof pictures and video for you to view later — so that you can see that the work was done correctly, and as expected.

Most normal roofs can be replaced in one (1) day. We design the size of our experienced, certified crews to install your roof quickly, so that the job doesn’t linger. Unlike others, we can design the schedule around weather events better, and don’t interrupt your normal day-to-day routine as much.

  • John Harber
  • Frostburg
  • 655.00 sq ft 2
  • June 2012
  • $235.00
  • Jason&Perry
  • Roofing